About

Homes,
not projects.

Since 2014, four residential buildings across Navi Mumbai — self-funded, personally supervised, one project at a time.

“I am not making projects. I am making homes.”

I got into construction to build the right way, not argue about the wrong one.

I’d watched too many buyers get stuck, and too many builders get stuck. More than a decade on, I still build the same way I started — self-funded, personally supervised, one project at a time. No outside money to answer to, no shortcuts to hide.

Founder
Vishrut Tripathi
Building since
2014
Projects
All handed over before promised date
Waterproofing
Five layers deep
How I work
Vishrut Tripathi, Founder, Vishrut Constructions

I don’t make a claim I can’t show. M30 concrete, Tata Steel, UltraTech cement, Godrej AAC blocks — same standard, every configuration, every project. What you walk through is the finished product, not a brochure of one.

How I build

Self-funded.

Every building has been built with my own money. There is no lender’s clock and no investor’s exit — the only person I answer to is the one moving in.

Personally supervised.

I am on site through the build, and I inspect every home before handover. Not a sample flat — every home, before its keys change hands.

One at a time.

Since 2014 I have never run two projects at once. The building under construction gets everything — attention, money and time.

The years
2014
Vishrut Constructions founded — Navi Mumbai.
2016
Athens, Kharghar — one-bedroom homes; OC received October 2016, built in eighteen months.
2016
Barcelona, Vashi — one 3 BHK to a floor; built in fourteen months.
2021
Casablanca, Ulwe — two wings; OC received March 2021, through Covid.
2023
Casablanca Phase 2, Ulwe — a seventh floor added to both wings; built 2022–2023.
2025
Dresden, Sector 17 Ulwe — OC received July 2025; residents moved in from September.

The difference lives in small decisions — sixteen door frames replaced over a five-millimetre gap. See how we build →

The record

Finished before the promise.

Four buildings, four promised dates — and every one handed over ahead of it. Drawn to scale, in months.

AthensKharghar · 2016
Completed · 18 months
promised 24
BarcelonaVashi · 2016
Completed · 14 months
promised 24
CasablancaUlwe · 2021, through Covid
Completed · 24 months
promised 30
DresdenUlwe · OC July 2025
Completed · 18 months
promised 24
Months: commencement to construction complete. Occupancy Certificate received on all four.

Walk into your finished home.

No model flat, no render — walk into a real one at Dresden, Sector 17 Ulwe, and decide for yourself.

+91 93301 12112
For a site visit · Mon–Sun, 10am–7pm
Contact us WhatsApp
×Enlarged photo